Customization: | Available |
---|---|
Type: | Cutter Suction Dredger |
Power Type: | Diesel |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Here are some basic steps and precautions for operating a cutter suction dredger: 1. Preparation before operation: -Operators should wear personal protective equipment correctly according to regulations, such as helmets, life jackets, seat belts, and anti slip shoes. -Conduct a comprehensive inspection of the equipment and instrument control system to ensure normal operation of the equipment. -Set up warning signs on the side of the floating pipe and the outlet of the sludge discharge pipe to remind passing personnel to pay attention to safety. 2. * * Specific operational requirements * *: -When entering the construction area, there should be a dedicated person to command and check that the water depth is appropriate before placing steel piles. -During the mud blowing process, if it is necessary to release the anchor cable from the floating pipe, the on duty personnel in the control room should be notified in advance to slow down the main engine. At the same time, personnel loosening the cable must wear life jackets and pay attention to observing the dynamics on the floating pipe. -It is strictly prohibited to insert the auxiliary steel pile into the water during lateral movement and blowing stoppage to avoid damaging the equipment. -When moving the anchor, the operator must wear a life jacket and stand in an appropriate position during operation to prevent damage to the anchor cable. -When working on water pipelines, it is necessary to wear a life jacket and strengthen the lookout, paying attention to ships coming and going. When the wind and waves are strong, work should be stopped. 3. * * Precautions * *: -For the transfer of construction vessels, detailed plans such as transfer routes, towing methods, personnel job division and vessel formation shall be formulated and implemented after being approved by the superior. -Crew members must undergo professional training and be familiar with the safety operating procedures and user manuals of each machine on this ship. -During the construction process, close attention should be paid to the operation status of the equipment. If any abnormal situations are found, the machine should be stopped for inspection in a timely manner and corresponding measures should be taken. It should be noted that there may be some differences between different models of cutter suction dredgers. Therefore, before operation, it is necessary to carefully read the equipment manual and strictly follow the operating procedures. At the same time, attention should also be paid to safety to ensure the safety of personnel and equipment during the construction process. If you need more detailed and accurate operation guidance, it is recommended to consult professional manufacturers or relevant technical personnel. |